Click to Home
Click to Home
Search
Go To Search
Click to Home
Click to Home
Chapter 314 Fee Schedule

 


SECTION:

314.01: Purpose and Findings
314.02: Other Fee References
314.03: Authority
314.04: Penalty
314.05: Fee Schedule
314.051: General Business Licenses and Fees
314.052: Administrative Fines
314.053: Building Permit & Plan Review Fees
314.054: Electrical Permits 

View the Fee Schedule as a pdf
 

314.01: PURPOSE AND FINDINGS

The City of Roseville annually adopts a Fee Schedule which establishes the fees and charges for service for the City’s regulatory functions. The presence of a fee schedule allows regulatory-type fees to be easily identified in one document, as opposed to being scattered throughout City Code. In addition, a fee schedule adopted on an annual basis provides the City Council the opportunity to review fees for services in a comprehensive manner.

 

314.02: OTHER FEE REFERENCES

By enacting this ordinance, all fee amounts previously established and contained herein are hereby amended as submitted.

 

314.03: AUTHORITY

The authority to enact the fees identified herein is established by City Code.

 

314.04: PENALTY

Failure to pay the fees identified herein is subject to penalties and interest as established by City Code.

 

314.05: FEE SCHEDULE

The 2011 Fee Schedule is as shown in 314.051 – 314.054

 

314.051: GENERAL BUSINESS LICENSES AND FEES

Fee / Charge Description

City Code

Amount

Amusement device – per machine

303

$ 15.00

Benches in right-of-way

703

40.00

Assessment searches

Deferred / Pending        

Historical      

 

 
0.00

100.00

Bowling alley

          First alley         

          Each additional alley         

 

303

303

 

70.00

20.00

Burial Permit

401

100.00

Building Permits

901

see Appendix A

Christmas trees, sale of

305

50.00

Cigarettes, sale of

306

200.00

Construction noise variance

405.03

300.00

Conversation parlors

308

10,000.00

Copy charges

N/A

0.25 / page

CPR Training

N/A

$80 / student

Daycare facility inspection fee

N/A

40.00

Dog and cat license

          2 year – sterilized

          2 year – sterilized and micro chipped

          2 year – non sterilized

          2 year – non sterilized and micro chipped

          Lifetime license – sterilized

          Lifetime license – sterilized and micro

                 chipped

          Lifetime license – non sterilized

          Lifetime license – non sterilized, but

                 micro chipped

          Duplicate / address change

            Special multiple – 2 year

 

501

501

501

501

501

 

501

501

 

501

501

501

 

10.00

5.00

35.00

25.00

30.00

 

5.00

150.00

 

100.00

5.00

40.00

Dog kennels

501

75.00

DVD / VHS Copy

 

5.00

Encroachment Agreement Application fee

N/A

275.00

Erosion control inspection permit

           Less than 1 acre

           1 to 5 acres

           More than 5 acres

 

1017

1017

1017

 

600.00

880.00

1,320.00

Erosion control permit renewal

     Less than 1 acre

     1 to 5 acres

     More than 5 acres

1017
1017
1017
1017

 

220.00

320.00

480.00

Erosion control escrow fee

1017

3,000/acre

  Excavation, grading, and surfacing


705


see Appendix A

False alarm fees - police 

          Third false alarm
          Fourth false alarm
          Fifth false alarm                
          Sixth false alarm

          Seventh and all subsequent false alarm

 

506

506
506
506
506

 

100.00

200.00
300.00
400.00
500.00

False alarm fees – fire 

          Third false alarm  
          Fourth false alarm                 

          Fifth and all subsequent false alarm 
          Construction-related         

 

506

506

506

N/A

 

300.00

400.00

500.00

150.00

Fertilizer, sale of

408

30.00

Fertilizer, applicator

408

100.00

Firearms, sale of

310

30.00

Fireworks, sale of consumer (existing retail)

N/A

100.00

Fireworks, sale of consumer (stand-alone, temporary)

N/A

350.00

Fire rescue and extrication fee

N/A

400.00

Fire safety training

N/A

80.00 / hr

Fuel storage tank inspection

N/A

100.00

Game room

303

175.00

Gas pumps – private business

310

60.00

Gasoline stations

310

130.00

Horse

501

5.00

Hospitals-veterinary

310

80.00

Lawful gambling                                

          One time event permit
          Premises permit   
                  

          Required contributions  

 

304

304

 

304

 

25.00

3% of gross receipts

10% of net profits

Leaf Pickup fee

 

50.00

Liquor licenses:

          On sale intoxicating liquor license 

          On sale wine license (establishments with 75 seats or less)     

          On sale wine license (establishments with 75 seats or more)   

          Temporary on sale (3 days)         

          Temporary on sale in Central Park     

          Sunday on sale license         

          Special club license (dependent on the

                   number of members):

                   51      – 200         

                   201    – 500         

                   501    – 1,000         

                   1,000 – 2,000         

                   2,001 – 4,000         

                   4,001 – 6,000         

                   More than 6,000         

          Off sale intoxicating liquor license 

 

302

 

302

 

302

302

302

302

 

 

302

302

302

302

302

302

302

302

 

7,000.00

 

750.00

 

1,500.00

50.00

20.00

200.00

 

 

300.00

500.00

650.00

800.00

1,000.00

2,000.00

3,000.00

300.00

Liquor License – investigation fee

302 300.00

Liquor License – sale outside of premises

302

25.00

Massage therapist

309

100.00

Massage therapy business establishment

309

150.00 / 300.00

Open burning permit

N/A

90.00

Park Dedication – residential 1103

3,000.00/unit

Park Dedication – other (c)

1103

5.0% of fmv

Pawn Shop license

311

10,000.00

Pathway patching fee
            Concrete sidewalk – 2 panels
            Bituminous (12’ x 8’)

675.00
500.00

Pawn shop and precious metal dealer license

311

13,000.00
Pawn shop fee (per transaction)
N/A

2.90

Pool and billiards

          First table         

          Each additional table         


303
303

70.00
20.00

Precious metal dealer

311

10,000.00

Public improvement contract application fee (b)

N/A

525.00

Recycling contractor

403

125.00

Rental Registration (Housing)

907

25.00

Right-of-way permits

703, 707

325.00

Sewer connection fees

802

see Appendix A

Sewer usage fees

802

separate resolution

Soil contamination

406

$1/cu.yd. up to $300

Solid waste hauler

402

125.00

Stormwater drainage fees

803

separate resolution

Stormwater residential permit
Stormwater residential permit renewal (5-years)
 n/a 250.00
100.00

Street patching fee (d)

n/a

600 / 1,200

Theaters – per viewing screen

310

70.00

Tree planting and removal

706

separate ordinance

Utility service location fee

N/A

100.00

Vehicle forfeiture impound fee (per day)

N/A

20.00

Water connection fees

801

see Appendix A

Water usage fees

801

separate resolution

Water tower permit – private use

801

separate resolution

Well permit

801

separate resolution

Wireless permit fee

1205

Negotiated

 

(b) In addition to the $525 base fee, a charge of 4% (increased from 3%) of the total improvement cost is also assessed.
(c) Calculation is made on 5% of the estimated fair market value of unimproved land, as determined by the Ramsey County Assessor’s office on the date of approval of the plat or subdivision.
(d) Street patching fee is $600 without a curb, and $1,200 with a curb. 

(Ord. 1421, 11-28-2011)

 

314.052:  Administrative Fines

Fee / Charge Description

City Code

Amount

Alcohol and Tobacco Sales:

          Purchase, possession - underage 

          Lending ID to underage person

          Selling tobacco – underage

          Selling alcohol – underage

          License holder                    

          Other violation 

 

N / A

 

$ 150.00

100.00

200.00

250.00

150.00

100.00

Parking:

          Handicap zone                   

          Fire lane

          Snowbird

          Blocking fire hydrant 

          Other illegal parking

 

N / A

 

100.00

25.00

25.00

25.00

25.00

Fires:  No open fires         

          Fire Code

N / A

25.00

100.00

Animals:

          Vicious animal         

          Barking dog

          Animal at large

          Other animal violation         

 

N / A

 

50.00

50.00

50.00

50.00

Miscellaneous:

          Building code         

          Fill permits

          Failure to apply for license

          Fireworks – use, possession, sale

          Land use

          Licenses (not occurring elsewhere)

          Illegal dumping

          Consuming alcohol-unauthorized places

          Tampering with Civic Defense System

          Seat belts

          Expired license plates

          Missing plate/tab

          Trespassing

          Golf cart / ATV violation

          Noise complaint

          Park ordinance violation

          Peddling
          Property nuisance calls (starting with 3rd call) (a)

          Public nuisance

          Regulated businesses

          Signs

          Snowmobiles         

          Discharge, display of weapon

          Wetland / Shore land         

 

N / A

















511

 

100.00

100.00

50.00

250.00

100.00

50.00

150.00

250.00

250.00

25.00

35.00

35.00

150.00

50.00

250.00

25.00

75.00

250.00

100.00
100.00

50.00

50.00

250.00

100.00

 

(a) Beginning with the 4th call, the cost is $250 plus the costs related to the call up to $2,000.
(Ord. 1421, 11-28-2011)

 

314.053:  Building Permit & Plan Review Fees

City Code Sections; 307, 801, 802, 901, 1014

 

Building Permit Fee – Zoning and Inspections:

Permit fee to be based on job cost valuation.  The determination of value or valuation shall be made by the building official.  The value to be used in computing the building permit and building plan review fees shall be the total of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. 

Total Valuation

Amount

$1 - $500

 

$31

$501 - $2,000

$31 for the first $500 value, plus $4 for each additional $100 value or fraction thereof

$2,001 - $25,000

$83.50 for the first $2,000 value, plus $16.55 for each additional $1,000 value or fraction thereof

$25,001 - $50,000

$464.15 for the first $25,000 value, plus $12.00 for each additional $1,000 value or fraction thereof

$50,001 - $100.000

$764.15 for the first $50,000 value,plus $8.45 for each additional $1,000 value or fraction thereof

$100,001 - $500,000

$1,186.65 for the first $100,000 value, plus $6.75 for each additional $1,000 value or fraction thereof

$500,0001 - $1,000,000

$3,886.65 for the first $500,000 value, plus $5.50 for each additional $1,000 value or fraction thereof

In excess of $1,000,000

$6,636.65 for the first $1,000,000 value, plus $4.50 for each additional $1,000 value or fraction thereof

Inspections outside of normal business hours

 

$63.50

Re-inspection fees

(per State Building code)

 

$63.50

Miscellaneous.

inspection fees

 

$63.50

Additional  plan review fee required by revisions

 

$63.50

 

Building Permit Fee – Engineering:

Total Valuation

Amount

$1 - $500

$ 5

$501 - $2,000

5

$2,001 - $25,000

25

$25,001 - $50,000

50

$50,001 - $100.000

75

$100,001 - $500,000

100

$500,0001 - $1,000,000

200

In excess of $1,000,000

300

 

Demolition Permit Fee:

Description

Amount

Tenant improvement/remodeling prior to building permit

$68.00

Structures not connected to utilities

90.00

Residential structures connected to city utilities

152.00

Commercial structures connected to city utilities

$390.00

 

Electrical Permit Fee:

Set through yearly contract with Contract Electrical Inspector.

 

Fire Safety Inspection Fee:

An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee (except for single-family dwellings) to be charged and used to defray the cost of fire safety inspections (Ord. 1237, 3-13-2000, eff. 5-1-2000)

 

Grading Plan Review Fee – Planning & Zoning:

Description

Amount

50 cubic yards or less

$75

51 – 10,000 cubic yards

$150.00 for the first 1,000 cubic yards, plus $10.00 for each additional 1,000 yards or fraction thereof

10,001 – 100,000 cubic yards

 

$300.00 for the first 10,000 cubic yards, plus $5.00 for each additional 10,000 yards or fraction thereof

In excess of 100,000 cubic yards

 

$800.00 for the first 100,000 cubic yards, plus $10.00 for each additional 10,000 yards or fraction thereof

 

Grading Plan Review Fee – Engineering:

Description

Amount

50 cubic yards or less

$ 25.00

51 – 10,000 cubic yards

25.00

10,001 – 100,000 cubic yards

50.00

In excess of 100,000 cubic yards

75.00

 

Grading Permit Fee – Planning & Zoning:

Description

Amount

50 cubic yards or less

$75

1 – 1,000 cubic yards

$100.00 for the first 100 cubic yards, plus $20.00 for each additional 100 yards or fraction thereof

1,001 – 10,000 cubic yards

$300.00 for the first 1,000 cubic yards, plus $30.00 for each additional 1,000 yards or fraction thereof

10,001 – 100,000 cubic yards

$600.00 for the first 10,000 cubic yards, plus $100.00 for each additional 10,000 yards or fraction thereof

In excess of 100,000 cubic yards

$1,500.00 for the first 100,000 cubic yards, plus $80.00 for each additional 10,000 yards or fraction thereof

 

Grading Permit Fee – Engineering:

Description

Amount

50 cubic yards or less

$ 25.00

1 – 1,000 cubic yards

25.00

1,001 – 10,000 cubic yards

50.00

10,001 – 100,000 cubic yards

75.00

In excess of 100,000 cubic yards

100.00

 

Investigation Fee: Work without a Permit

Whenever any work for which a permit is required from the city has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.  An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued.  The investigation fee shall be equal to the amount of the permit fee required by this code.  The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law. 

 

Manufactured Home Permit Fee:

Description

Amount

New installation

$ 260.00

 

Mechanical Permit Fee - Residential:

Description

Amount

Air conditioning – new

$ 45.00

Air conditioning – replacement

57.00

Warm air furnace – new

95.00

Warm air furnace - replacement

57.00

Hot water boilers – new

95.00

Hot water boilers – replacement

57.00

Unit heaters

57.00

Swimming pool heaters

57.00

Misc. work & gas piping

1.28% of job cost

Minimum fee

57.00

Gas fireplace

57.00

In floor heat

$78.00

 Solar Panel installation  1.28% of job cost/$150.00 min fee

 

Mechanical Permit Fee - Commercial:

Description

Amount

All commercial work

1.28% of job cost/$57.00 min fee

 

Moving Permit Fee:

Description

Amount

Over private property only

$87.00

Over public streets

127.00

Investigation fee per hour

$64.50

 

Plumbing Permit Fee:

Description

Amount

Administrative/minimum fee

$ 57.00

Additional for each fixture opening

10.00

Miscellaneous work

1.28% of job cost

Backflow prevention verification

$ 26.00

 

Plan Review Fee:

When a building permit is required and a plan is required to be submitted, a plan checking fee shall be paid.  Plan checking fees for all buildings, except for construction costs in R-1 and R-2 zones which do not involve new single family structures and are of less than seven thousand dollars ($7,000.00), shall be sixty five percent (65%) of the building permit fee as set forth in Section 901.06 of this chapter, except as modified in M.S.B.C. Section 1300. (Ord. 1110, 4-13-1992)

The plan review fees specified are separate fees from the permit fees and are in addition to the permit fees. 

 

When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items an additional plan review fee shall be charged. 

 

Expiration of plan review.  Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the building official.  The building official may extend the time for action by the applicant for a period not exceeding 180 days on request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken.  No application shall be extended more than once.  In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

 

Refund Fee:

The building official may authorize refunding of any fee paid hereunder which was erroneously paid or collected.

 

The building official may authorize a refunding of permit fees paid when no work has been done under a permit issued in accordance with this code. 

The building official may authorize a refunding of plan review fees paid when an application for a permit for which a plan review fee has paid is withdrawn or canceled before any plan reviewing is done.

 

The building official shall not authorize refunding of any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. 

 

Sewer Connection Permit Fee – Planning & Zoning:

Description

Amount

Residential

$ 87.00

Commercial

280.00

Repair

57.00

Disconnect – residential

78.00

Disconnect – commercial

$ 157.00

 

Sewer Connection Permit Fee – Engineering:

Description

Amount

Residential

$ 5.00

Commercial

25.00

Repair

5.00

Disconnect – residential

25.00

Disconnect – commercial

75.00

 

Sign Permit Fee:

Utilize building permit fee schedule.  No plan review fee

Description

Amount

Permanent Sign - Minimum fee

$ 55.00

Temporary Sign  25.00

 

Swimming Pool Permit Fee – Planning & Zoning:

Description

Amount

Residential pool

$ 197.00

 

Commercial pool

Utilize building

Permit fee Schedule

 

Swimming Pool Permit Fee – Engineering:

Description

Amount

Residential pool

$ 15.00

Commercial pool

-

 

Water Connection Permit Fee – Planning & Zoning:

Description

Amount

Residential

$ 87.00

Commercial

280.00

Repair

57.00

Disconnect – residential

78.00

Disconnect – commercial

$ 157.00

 

Water Connection Permit Fee – Engineering:

Description

Amount

Residential

$ 5.00

Commercial

25.00

Repair

5.00

Disconnect – residential

25.00

Disconnect – commercial

75.00

Water main tapping fee  325.00

 

Residential Land Use Permit Fee (Fences, Walls, Sheds, Driveways, Draintile System) – Planning & Zoning:

Description

Amount

Driveway permits

$ 46.00

Fence permits – residential

75.00

Fence permits - commercial

Use Permit Fee Schedule

Shed permits

50.00

Drain tile

110.00

Other – utilize building permit fee schedule

 

 

 

Miscellaneous Fees:

Lead Abatement License Fee

Description

Amount

Minimum roofing fee

$ 112.00

Minimum window replacement fee

85.00

Minimum siding replacement fee

85.00

Administrative fee for abatement per hour

64.50

Wood burning fireplace

85.00

Verification of state contracting license

5.00

Replacement inspection card

20.00

Re-stamping job site plan sets

30.00

Certificate of Occupancy – conditional

30.00

Certificate of Occupancy – full

20.00

Certificate of Occupancy – copy

10.00

City contractor license fee

87.00

Administrative fee – R1 or R2 zones

64.50

Administrative fee – other zones

64.50

Footing/foundation permits – residential

95.00

Footing/foundation permits – commercial

434.00

Construction deposit – residential

800.00

Construction deposit – commercial

4,000.00

SAC Admin Fee

$ 16.00

Lead Abatement License Fee  5.00
Property Age Verification Fee  5.00
Outdoor Display Permit Fee  40.00

 


Community Development Department Permit and Miscellaneous Fees

Item/Permit

Amount

City Consultant Review/Research - Comm./Industrial/Multi-family land use, economic development, utility, building permit review, traffic, or development or redevelopment projects or proposals payable as escrow or at building permit

 

100% of  direct cost billed to  applicant

Planned Unit Development – Amendment

400

Planned Unit Development – Escrow (Amendment)****

$2,000 minimum

PUD Escrow (historical data collection & analysis; site plan & survey review & analysis; city approval analysis; letter creation)

 Staff hourly rate/1.9 times per hour.  $50.00 per hour minimum

 

Rezoning of Project Site or Parcel**

600

Zoning  Code Text Amendment**

600

Vacation of Right-of-Way**

300

Vacation of Easement**

300

Comprehensive Plan – Text Amendment**

825

Comprehensive Plan – Designation  Amendment**

 

825

Conditional Use - Residential**

300

Conditional Use - Commercial**

600

Conditional Use Escrow – Commercial****

1,000 minimum

Subdivision – Escrow****

1,500 minimum

Subdivision Escrow (historical data collection & analysis; site plan & survey review & analysis; city approval analysis; letter creation)

 Staff hourly rate/1.9 times per hour.  $50.00 per hour minimum

 

Subdivision – Minor**

500

Subdivision – Preliminary Plat

500

Subdivision - Final Plat

500

Variance - Residential**

300

Variance - Non Residential**

400

Interim Use**

600

Interim Use extension**

150

Setback Permit Administrative

100

Zoning Compliance Letter (historical data collection & analysis; site plan & survey review & analysis; city approval analysis; letter creation)

 Staff hourly rate/1.9 times per hour.  $50.00 per hour minimum

 

Residential Variance Appeal Fee

250

Commercial Variance Appeal Fee

275

Master Sign Plan – residential

250

Master Sign Plan – commercial

350

Accessory Dwelling Unit Permit  100

Extra Mailing Cost (for mailing notices when more than 50 are required)

 

0.45 each

Tax Increment Finance (establishment of district or review of proposal, including city consultants)

$15,000 deposit – minimum fee plus consultants fees

Planning Commission Agendas/Year (mailed)

10.00*

Planning Commission Minutes/Year (mailed)

15.00*

Comprehensive Plan CD

20.00*

Zoning Code CD

20.00*

Research Staff Time

Staff hourly rate/1.9 times per hour.  $50.00 per hour minimum

Copying

$.25/sheet

Maps*** – 8 ½ x 11 (black and white) – existing PDF maps

 

No Charge*

Maps – 8 ½ x 11 (color) – existing PDF maps

1.00*

Maps – 11 x 17 (color) – existing PDF maps

2.00*

Maps – 17 x 22 (color) – existing PDF maps

10.00*

Maps – 22 x 34 (color) – existing PDF maps

20.00*

Maps – 34 x 44 (color) – existing PDF maps

40.00*

City Address Book (11x17)* – existing PDF maps

100.00 per book*

 

*       Free/no charge on internet city home page and available for review at library and city hall

**     If multiple requests (such as a subdivision, a variance, and a conditional use permit) are part of one application, City charges only for most expensive permit application

***   Maps/data that are to be created as custom requests are to be charged at a time and materials rate. (GIS Coordinator hourly rate times 1.9 multiplier)

**** The amount listed under the PUD, CU, and Subdivision Escrow is the minimum amount required for the application.  A higher amount, as determined by the City, may be required for projects that will take a significant amount of time.

(Ord. 1387, 11-16-2009)

 


314.054:  Electrical Permits

Electrical Permit Fees

A.    Minimum fee for each separate inspection of an installation, replacement, alteration or repair is limited to one inspection only:                          

Amount

$ 35.00

B.         Services, changes of service, temporary services, additions, alterations or repairs on either primary or secondary services shall be computed separately:

Description

Amount

0 to 300 amp

$ 50.00

301 to 400 amp

58.00

401 to 500 amp

72.00

501 to 600 amp

86.00

601 to 800 amp

114.00

801 to 1,000 amp

142.00

1,001 to 1,100 amp

156.00

1,101 to 1,200 amp

170.00

Add $14 for each add’l 100 amps

 

 

C.        Circuits, installation of additions, alterations, or repairs of each circuit or sub-feeder shall be computed separately, including circuits fed from sub-feeders and including the equipment served, except as provided for in (D) through (K):

Description

Amount

0 to 30 amp

$ 8.00

31 to 100 amp

10.00

101 to 200 amp

15.00

201 to 300 amp

20.00

301 to 400 amp

25.00

401 to 500 amp

30.00

501 to 600 amp

35.00

601 to 700 amp

40.00

Add $5 for each add’l 100 amps

 

 

D.        Maximum fee for single-family dwelling shall not exceed $150.00 if not over 200-ampere capacity. This includes service, feeders, circuits, fixtures and equipment. The maximum fee provides for not more than two rough-in inspections and the final inspection per dwelling.  Additional inspections are at the re-inspection rate.

E.         Maximum fee on an apartment building shall not exceed $70.00 per dwelling unit.  A two-unit dwelling (duplex) maximum fee per unit as per single-family dwelling.

F.       The fee for remote control/signal circuits is $0.75 per device.

G.       In addition to the above fees:

1)                A charge of $4.00 will be made for each street lighting standard.

2)                A charge of $7.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing fees.

H.        In addition to the above fees, all transformers and generators for light, heat and power shall be computed separately at $8.00 plus $.40 per KVA up to and including 100 KVA. 101 KVA and over at $.30 per KVA.  The maximum fee for any transformer or generator in this category is $80.00.

I.         In addition to the above fees, all transformers for signs and outline lighting shall be computed at $8.00.                                                   

J.       The fee for retro fit lighting is $0.65 per light fixture.

K.       In addition to the above fees, the inspection fee for each separate inspection of a swimming pool shall be computed at $35.00.  Reinforcing steel for swimming pools requires a rough-in inspection.

L.       For the review of plans and specifications of proposed installations, there shall be a minimum fee of $150.00 up to and including $30,000 of electrical estimate, plus 1/10 of 1% on any amount in excess of $30,000 to be paid by permit applicant.

M.      When re-inspection is necessary to determine whether unsafe conditions have been corrected and such conditions are not subject to an appeal pending before any Court, a re-inspection fee of $35.00 may be assessed in writing by the Inspector.

N.       For inspections not covered herein, or for requested special inspections or services, the fee shall be established separately.

O.      For inspection of transient projects, including but not limited to, carnivals and circuses, the inspection fees shall be computed as follows:

         Power supply units according to Item “B” of fee schedule. A like fee will be required on power supply units at each engagement during the season, except that a fee of $35.00 per hour will be charged for additional time spent by the Inspector if the power supply is not ready for inspections as required by law.

         Rides, Devises or Concessions: Shall be inspected at their first appearance of the season and the inspection fee shall be $35.00 per unit.

P.         The fee is doubled if the work starts before the permit is issued.

(Ord.1431, 11-19-2012)

 

 

 

 

 | 2660 Civic Center Drive, Roseville, MN 55113 | 651-792-7000